Official sources checked August 30, 2026
Livingston County, Michigan septic permits and requirements
Permitting authority
Livingston County Health Department — Environmental Health Division / Septic Services
Livingston County Health Department Environmental Health, 2300 E. Grand River Ave., Suite 102, Howell, MI 48843; 517-546-9858.
Michigan onsite-wastewater framework
Michigan EGLE states that onsite wastewater management is a required local-health-department service under the Michigan Public Health Code. Local health departments carry out ordinary onsite permitting and review while EGLE provides oversight, technical support, and review for certain larger or specialized systems.
Confirm project scope before construction
Local sanitary codes, sewer availability, wastewater flow, commercial use, property additions, replacement work, and alternative or engineered systems can change the approval path. Use the current county instructions and any applicable EGLE review before excavation or installation.
County Environmental Health administers septic permits and inspections
Livingston County states that septic systems must be permitted and installed under the Livingston County Sanitary Code and that Environmental Health Specialists conduct installation inspections and investigate failing-system complaints.
An approved soil evaluation comes before the septic permit
Livingston County requires a soil evaluation to be completed and approved before a septic permit application can be submitted. The issued soil evaluation contains site-specific requirements used for the permit.
Permit applications require parcel and site documentation
For new construction, the county lists a permanent street address, certified survey/legal description, accurate plot plan, applicable fees, and other project approvals among the materials used in the well/septic and building-permit sequence.
Construction changes require county approval and final septic approval
The septic contractor schedules the inspections listed on the permit. Livingston County states that changes from the approved plans must be approved by Environmental Health before excavation or construction, and a completed permit is forwarded to the building department after the septic inspections so the building department can proceed with Certificate of Occupancy review.
County septic permits have a one-year construction window
Livingston County states that sewage/well permits provide one year from issuance to complete construction. After that, the permit must be rewritten and a fee assessed; changes requiring another site visit can add a fee.
Additions and property modifications require site review
Livingston County requires a site review for additions or modifications on properties served by well or septic, including examples such as enclosed decks, pole barns, home additions, garages and pools.
No county point-of-sale septic inspection program
Livingston County explicitly states that it does not have a point-of-sale program and does not perform well/septic inspections merely because property ownership changes. Existing records can still be searched, and new or replacement work remains subject to county permitting.
Official sources
- Michigan EGLE — Onsite Wastewater Management
- Michigan EGLE — Onsite program contacts and direct-oversight counties
- Livingston County — Septic Services
- Livingston County — Septic Permits
- Livingston County — Realtor Resources
SepticScope summarizes public-agency information for planning purposes. The permitting agency's current instructions control if they differ from this guide.
Septic rules, forms and agency pages can change. If you find a broken official link or a county requirement that has changed, send SepticScope feedback and include the current local government source.