Home / Counties / Tennessee / Sevier County

Official sources checked August 30, 2026

Sevier County, Tennessee septic permits and requirements

Permitting authority

Sevier County Environmental Health

Sevier County Environmental Health, 227 Cedar Street, Sevierville, TN 37862; 865-429-1766. The department accepts septic, repair, inspection-letter, and site-evaluation applications and provides local installer, pumper, engineer/surveyor, and soil-scientist resources.

Tennessee contract-county framework

TDEC’s current septic-services page identifies Davidson, Knox, and Sevier among the jurisdictions that provide their own groundwater-protection services. SepticScope therefore follows the local metropolitan or county process below instead of substituting the standard TDEC field-office workflow used in most Tennessee counties.

Sevier County runs the local septic application process

TDEC identifies Sevier as a contract county, and Sevier County Environmental Health publishes the local septic permit, repair permit, site evaluation, inspection letter, subdivision evaluation, installer/pumper resources, and property-information process. Applicants should use this county workflow rather than the ordinary TDEC online application used in non-contract counties.

The county accepts several applications online

Sevier County states that septic permit, repair permit, well-water test, inspection-letter, and site-evaluation applications may be submitted through its online application system. The county notes that processing does not begin until payment and all required material are received; subdivision and large-conventional-system services continue to use the county’s other filing procedures.

Certain subdivisions require a current survey

Sevier County specifically requires current surveys for applications in Shagbark, Sky Harbor, and English Mountain. The county states that those surveys must be original surveyor prints at 1 inch = 50 feet or 1 inch = 100 feet, and an inspector may request a survey elsewhere when lot lines are uncertain or the property has not been surveyed recently.

Failed final inspections trigger a county reinspection process

Effective June 1, 2024, Sevier County requires a reinspection application and a $100 reinspection fee after a septic final inspection fails the initial inspection. The installer must correct the cited issue and then follow the county process to schedule the return inspection.

The county publishes current project-specific septic fees

Sevier County’s Environmental Health page currently lists a $300 septic permit, $75 repair permit, $100 inspection letter, and subdivision evaluation fees, while also linking its current fee schedule. Because fees can change, applicants should confirm the posted schedule when filing.

One- and two-bedroom homes have published minimum home-size criteria

Sevier County publishes an effective August 14, 2023 local notice stating minimum home sizes of 1,200 square feet for a one-bedroom home and 1,500 square feet for a two-bedroom home in the cited septic guidance. Property owners planning a small dwelling should confirm the current applicability of that county criterion before finalizing plans.

Official sources

SepticScope summarizes public-agency information for planning purposes. The permitting agency's current instructions control if they differ from this guide.