Home / Counties / Washington / Benton County

Official sources checked August 29, 2026

Benton County, Washington septic permits and requirements

Permitting authority

Benton-Franklin Health District — On-Site Sewage Program

Environmental Health / sewage systems: 509-460-4205. Kennewick office: 7102 W. Okanogan Place, Kennewick, WA 99336.

Washington local-health-jurisdiction framework

Washington State Department of Health assigns property-level onsite sewage permitting and management to local health jurisdictions. County or district rules and procedures can be more specific than the statewide minimums.

Local health district permits systems under 3,500 gallons per day

Benton-Franklin Health District states that it is responsible for permitting onsite septic systems with design flows below 3,500 gallons per day and for overseeing design, installation, and inspection.

Final inspection before backfill

After installation and before the system is backfilled, the owner or installer must request the Health District final inspection. The district states that the system is approved for use after it passes that final inspection.

As-built records are retained

After approval, the Health District keeps the original as-built drawing in its records and provides a copy showing the final septic-system location. Property owners can request existing system records using an address or parcel number.

Official sources

SepticScope summarizes public-agency information for planning purposes. The permitting agency's current instructions control if they differ from this guide.