Official sources checked August 31, 2026
Clallam County, Washington septic permits and requirements
Permitting authority
Clallam County Environmental Health Services — On-site Septic Program
Clallam County Environmental Health Services, 223 E 4th Street, Room 130, Port Angeles, WA 98362; 360-417-2258. CCEH processes septic permits countywide, including systems in city areas that are not served by sewer.
Washington state/local framework
Washington Department of Health states that the local health officer has regulatory jurisdiction over onsite sewage systems with design flows from 0 through 3,499 gallons per day. Local health jurisdictions permit and manage those systems and may administer local codes that are more protective than the statewide minimums.
Local permitting authority
Clallam County Environmental Health Services states that it processes onsite septic permits throughout Clallam County. A permit is required to install a new system and to repair, replace, or expand an existing system, including work on the septic tank, drainfield, or related components.
Site registration and soils evaluation come first
Clallam County identifies Site Registration as the first step in the septic-permit process. A licensed septic designer coordinates the soils and site evaluation with Environmental Health, then submits the design, permit application, and applicable fees for county review.
Permit validity varies by permit type
Clallam County publishes different validity periods by permit type: a new septic-system construction permit is valid for three years, a tank-placement permit for one year, and a repair permit for six months unless the county formally extends it. The county states that expired septic permits must be resubmitted rather than renewed.
Decommissioning requires county approval
Clallam County requires an approved septic decommissioning permit when a tank or other sewage container is permanently abandoned. The county describes a pump, crush-and-fill process and requires documentation of the professional work so the county inventory can be updated.
Ongoing inspection and maintenance
Clallam County explains that gravity-fed systems are generally inspected every three years and systems with pumps annually under Washington operation-and-maintenance rules. Owners are also directed to protect the reserve area for future replacement.
Official sources
- Washington State Department of Health — Regulatory Jurisdiction
- Washington State Department of Health — OSS Management Roles
- Clallam County — Septic System Permits
- Clallam County — On-site Septic Program
- Clallam County — Maintaining Your Septic System
- Clallam County — Professional Resources
SepticScope summarizes public-agency information for planning purposes. The permitting agency's current instructions control if they differ from this guide.
Septic rules, forms and agency pages can change. If you find a broken official link or a county requirement that has changed, send SepticScope feedback and include the current local government source.