Dane County, Wisconsin septic permits and requirements

Permitting authority

Public Health Madison & Dane County — Environmental Health / Well & Septic Program

Public Health Madison & Dane County Environmental Health; phone 608-242-6515; [email protected]. The county program assigns sanitarians by district for septic permitting and inspection.

Wisconsin POWTS framework

Wisconsin Department of Safety and Professional Services provides the statewide POWTS code framework, sanitary permit and soil/site evaluation forms, plan-review resources, and licensing requirements used with county administration. County requirements below add the local filing, inspection, maintenance, and jurisdiction details supported by official sources.

Confirm sewer service and project-specific approvals

A POWTS permit applies to onsite wastewater treatment. Public sewer availability, system type, wastewater design flow, remodeling or occupancy changes, and specialized treatment components can change the required review path. Confirm current county and Wisconsin DSPS requirements before construction, repair, replacement, or reconnection.

Local permit and inspection authority

Public Health Madison & Dane County states that it reviews septic designs, issues sanitary permits, inspects system construction, and oversees required septic inspection and maintenance. The county program uses district sanitarians for properties served by private systems.

Work that requires a sanitary permit

The county specifically requires a sanitary permit to install or replace a private septic system; repair, extend, or enlarge an existing system; reconnect to an existing system; or otherwise modify a system when the work falls within the county program.

Soil evaluation and system design come before permit issuance

Dane County instructs applicants to obtain a soil evaluation from a licensed certified soil tester and a system design from an appropriately licensed professional. The licensed professional submits the sanitary permit application; projects requiring plan review must also follow the county or Wisconsin DSPS plan-review path.

Three-year maintenance applies to most systems

Public Health Madison & Dane County states that most systems must be inspected every three years. If the inspection finds combined sludge and scum equal to at least one-third of tank volume, pumping is required. Some systems have more frequent service requirements, so owners should use the maintenance schedule assigned to the permitted system.

Maintenance reporting and abandonment are tracked

Owners are responsible for ensuring inspection/service information is reported to the county. The county also requires owners to report septic-system abandonment so the system can be removed from active maintenance tracking.